Laserfiche WebLink
SO'd %L6 6L?-O VVE SZ6 9T:ST V0W-02-adw <br /> Site I te Address: 10 E. 12TH ST.,TRO A of Testing/Servicing: <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . . . . . . . . . — . . . . . . . . . . . . . . . I . . . . . . . . . . <br /> . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . — . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . .. -fl- <br /> . . . . . . . . . . . . . . . -A <br /> tA4�A <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . .. . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> AV <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . - - - - <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> t <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. <br /> Page _of 05/00 <br /> 900e N SHOIAUHS MAIM 6LZ0 VVZ SZ6 YVa 90:9T RM VO/OUCO <br />