My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer F Industry Standard r Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: pressure r Vacuum r Hydrostatic <br /> F Other(Specify) <br /> T*Material: <br /> d: 4" Dial Gauge Equipment Resolution: .1 <br /> Piping Run Piping Run Piping Run Piping Run <br /> Supply UE058U002 Return UE058U002 Vent UFA58U00'L <br /> PiPoly Poly Fiberglass <br /> Piping Manufacturer: Western Fiberglass Western Fiberglass A.O. Smith <br /> Piping Diameter: V 1.5" 3" <br /> Length of Piping Run: Approx. 39 Approx. 30' Approx. 30' <br /> Product Stored: Diesel Diesel Diesel <br /> Method and location of piping-run Test Boots Test Boots Test Boots <br /> isolation: <br /> Wait time between applying <br /> pressure/vacuum/waterand 15 min. 15 min. 15 min. <br /> starting test: <br /> Test Start Time: 9:01 am 9:01 am 9:01 am <br /> Initial Reading(Rl): 5 psi 5 psi 5 psi <br /> Test End Time: 10:01 am 10:01 am 10:01 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(R rRt): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result: 'Pass F Fail Pass Fail Pass Fail F Pass F Fail <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.