My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.PIPING SUMP TESTING <br /> Test Method Developed By: F Sump Manufacturer F Industry Standard F Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: Pressure F Vacuum F Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: .0006 <br /> u mp Sump Sump Sump <br /> UF058UO02 <br /> Sump Diameter: 38" <br /> Sump Depth: 42" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 22„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 21„ <br /> Electrical Penetration: <br /> Condition of sump priorto Good <br /> testing : <br /> Portion of Sump Tested(1) 2" above high pipe <br /> Does turbine shut down when g� $ @— <br /> sump sensor detects liquid(both f Y.I No PNA 9 Ys f No 1 NA F .Yes&.p— No� NA I g Y.7 No 9 NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail- gq-�; pp^ C g y y— y� p <br /> safe shutdown?* Yes No P NA {i Yes i No g7 '. NA ! Yes F No F NA I Yes I No 1 NA <br /> Was fail-safe VEClfled t0 be Yes I No 30 NA 1 Yes 1 No 1 NA F Yes! No f NA F Y.1 No f NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 9:04 am 9:20 am <br /> Initial Reading(Ri): 2.5741 2.5735 <br /> Test End Time: 9:19 am 9:35 am <br /> Final Reading(RF): 2.5735 2.5732 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RrRt): .0006 .0003 <br /> Pass/FaiI Threshold or Criteria: .002 1.002 <br /> Test Result: rl Pass r r j ( r <br /> Fail r Pass r f Fail Pass Fail Pass r jFail <br /> g- 7 <br /> Was sensor removed for testing? Y.F No NA Yes 1 No 3 NA Yes 1 No NA F Y.F No @ NA <br /> Was sensor properly replaced and — — <br /> Ven fied functional after testing? Yes d No r NA Ya No NA f Yes r No f NA r Yes F No NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The sensor was reinstalled to the lowest point,but not tested. <br /> i <br /> i <br /> (1) If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated <br /> with an asterisk(*)is"NO"or"NN',the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.