Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: <br /> F Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> No* Has all input wiring been inspected n ... �n <br /> r Yes g for proper entry and termination,including testing for Bound faults? <br /> r Yes F No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> • Yes F No* Was accuracy of system product level readings tested? <br /> r' Yes F No* Was accuracy of system water level readings tested? <br /> Yes F No* Were all probes reinstalled properly? <br /> Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or wil be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> * For equipment start_ <br /> F Yes r— No q . up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br /> F N/A all that apply) Simulated leak rate: F 3 gp.h.; F 0.1 gp.h; f 02 g.p.h. <br /> F Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? � <br /> r Yes_ �F�No* Was the testing apparatus properly calibrated? <br /> Yes F No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> __........ _ ...._ _ _, .......___. <br /> F Yes F No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r N/A _ <br /> F Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> :-:: ::::::::w <br /> • Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> r Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> r Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe haw and when these deficiencies were or willbe corrected <br /> H. Comments: <br /> Suction System <br />