Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software Version Installed: 121.00 <br /> Com tete the followin checklist: <br /> tYes F No* Is the audible alarm operational? <br /> F Yes F No* Is the visual alarm operational? <br /> r Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> proper operation? <br /> * Yes r No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> F N/A operational? <br /> Yes r No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> F N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> F Sump/Trench Sensors; r Dispenser Containment Sensors. Did you confirm positive shut-down <br /> due to leaks and sensor failure/disconnection? <br /> F Yes; FNo. <br /> * Yes F No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the <br /> tank fill point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger? <br /> F Yes* F No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* F No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br /> apply) F Product; F Water.If yes,describe causes in Section E,below. <br /> • Yes r No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes F, No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section below,describe how and when these deficiencies were or will he corrected <br /> E. Comments: <br /> Other sensor from Page 1: <br /> (L4)Gen.Room Floor:794380-208/certified <br /> An Overfill Prevention Valve is installed in the drop tube. <br />