My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: <br /> F Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Mr No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> No* Were all tankgauging probes visually inspected fordamageand residuebuildup? <br /> F No* Was accuracy of system product level readings tested? <br /> No* Was accuracy of system water level readings tested? <br /> No* Were all probes reinstalled properly? <br /> F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how andwhen these deficiencies were or w01 be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • Yes F No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD perform an ce?(Ch eck <br /> F7 N/A all that apply)Simulated leak rate: r 3 g.p.h.; r 0.1 g.p.h; � 0.2 g.p.h. <br /> • Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> F YesF No* Was the testing apparatus properly calibrated? <br /> • Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F N/A <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> F N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> • Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> �! N/A fails a test? <br /> F Yes r— No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> F N/A 7 <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section If,below,describe how and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.