Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: <br /> F Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Mr No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> No* Were all tankgauging probes visually inspected fordamageand residuebuildup? <br /> F No* Was accuracy of system product level readings tested? <br /> No* Was accuracy of system water level readings tested? <br /> No* Were all probes reinstalled properly? <br /> F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how andwhen these deficiencies were or w01 be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> • Yes F No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD perform an ce?(Ch eck <br /> F7 N/A all that apply)Simulated leak rate: r 3 g.p.h.; r 0.1 g.p.h; � 0.2 g.p.h. <br /> • Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> F YesF No* Was the testing apparatus properly calibrated? <br /> • Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F N/A <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> F N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> • Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> �! N/A fails a test? <br /> F Yes r— No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> F N/A 7 <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section If,below,describe how and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction system. <br />