My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of 5 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed by ❑ Piping Manufacturer M Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used M Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:4"Liquid Filled Gauge Equipment Resolution: .I <br /> Piping Run#Supply Piping Run#Return Piping Run#Vent Piping Run# <br /> UE058UO02 UE058UO02 UE058UO02 <br /> Piping Material: Poly Poly Fiberglass <br /> Piping Manufacturer: Western Fiberglass Western Fiberglass A.O.Smith <br /> Piping Diameter: 1" 1.5" 3" <br /> Length of Piping Run: Approx.30' Approx.30' Approx.30' <br /> Product Stored: Diesel Diesel Diesel <br /> Method and location of piping-run Test Boot Test Boot Test Boot <br /> isolation: <br /> Wait Time between applying 15 min 15 min 15 min <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 9:00 am 9:00 am 9:30 am <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi <br /> Test End Time: 10:00 am 10:00 am 10:30 am <br /> Final Reading(Rf): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(Rf-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result M Pass ❑ Fail M Pass ❑ K!!j__jjj M Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br />
The URL can be used to link to this page
Your browser does not support the video tag.