Laserfiche WebLink
SWRCB,January 2002 Page 4 of 5 <br /> 6.PIPING SUMP TESTING <br /> Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: .0006 <br /> Sump#Piping Sump# Sump# Sump# <br /> UE058U002 <br /> Sump Diameter 38" <br /> Sump Depth 42" <br /> Sump Material Fiberglass <br /> Height from Tank Top to Top of 22" <br /> Highest Piping Penetration <br /> Height from Tank Top to Lowest 21" <br /> Electrical Penetration <br /> Condition of sump prior to testing Good <br /> Portion of Sump Tested(1) pe above highest <br /> enetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> product and water)?* <br /> Turbine shutdown response time NA <br /> Is sytem programmed for fail-safe ❑ Yes ❑ No N NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> op erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min <br /> test <br /> Test Start Time 9:36 am 9:54 am <br /> Initial Reading Ri) 4.1227 4.1225 <br /> Test End Time 9:51 am 10:10 am <br /> Final Reading R 4.1226 4.1225 <br /> Test Duration 15 min 15 min <br /> Chane in Reading Rf-Ri .0001 .0000 <br /> Pass/Fail Threshold or Criteria .002 <br /> Test Result ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> verified functional after testin ? <br /> Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br /> The sensor was reinstalled to the lowest point but not tested. <br /> (1)If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />