My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH & SAFETY 6 <br />All electrical lines, piping, and like items known to be associated with the tank shall be <br />isolated or disconnected. <br />If at anytime during the excavation, the lower explosive limit of the atmosphere around <br />the tank exceeds 25 percent, all work will cease and proper mitigation procedures <br />initiated. <br />1�411181[111q$ 1 11 0 . I I I EN&MRMUM-Mi t�111:1��111 _11 a <br />Any and all soil removal and disposal is the sole responsibility of the client, and all soil samples <br />will be analyzed per clients' requirements. <br />11. Lock -out / Tag -out procedures (Energy Isolation) <br />Lock -out procedures must be followed during the cleaning, servicing, or adjusting of <br />machinery or electrical equipment. LOTO procedures shall be implemented as required <br />by applicable Federal, State, or Property Owner rules and regulations. <br />100% fall protection shall be employed for all work at heights. Fall protection shall <br />include scaffolds, aerial lifts, and personnel hoists. Also guardrails, toe boards, and other <br />primary systems may be implemented. In addition, provisions for secondary fall protection <br />(full-body harness and fall arrest systems) shall be used for employees working or traveling <br />more than six (6) feet above a lower level and are exposed to an imminent fall hazard (this <br />includes working conditions hat present hazards such as leading edge, open holes, and <br />skylights on building rooftops and/or other elevated towers/structures). All fall protection <br />devices used shall be manufactured in accordance with an acceptable recognized standard <br />utilizing a design approved by a professional engineer. No job —built devices or equipment are <br />allowed. <br />12.1 Fall arrest systems shall include: <br />11/07/2005 revision 5 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.