My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />SWRCB, January 2002 <br />Page _2_ of —2- <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: ® Tank Manufacturer ❑ Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure ® Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: DIGITAL MANOMETER <br />Is Tank Exem!FromT!es1ing91® <br />2 Tank # <br />No ❑ Yes ❑ No <br />Equipment Resolution: N/A <br />Tank # Tank # <br />❑ Yes ❑ No ❑ Yes ❑ No <br />Tank Capacity <br />52 <br />7FIBER-STEEL <br />Tank Material: <br />Tank Manufacturer: <br />ERN <br />WELDING <br />Product Stored: <br />RED DIESEL <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MINUTES <br />Test Start Time: <br />8:50 A.M. <br />Initial Reading (Rj): <br />7" HG <br />Test End Time: <br />9:50 A.M. <br />Final Reading (RF): <br />7" HG <br />Test Duration: <br />1 HOUR <br />Change in Reading (RF -RI): <br />0" HG <br />Pass/Fail Threshold or Criteria: <br />+0" HG <br />Test Result: <br />0 _Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass p Fail <br />Was sensor removed for testing? <br />i ® Yes No NA <br />❑ Yes No NA <br />❑ Yes No NA <br />❑ Yes No NA <br />Was sensor properly replaced and ® Yes No NA ❑ Yes No NA ❑ Yes No NA ❑ Yes No NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />*Diesel Annular passed tank manufacturer's recommended test. <br />No repairs are needed at present time. <br />1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6) ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.