My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page _3_ of —3- <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />® Pressure <br />Other (Specify) <br />Vacuum <br />Hydrostatic <br />Test Equipment Used: 3" ANALOG GAUGE <br />Piping Run # Supply <br />rPipingial: POLY <br />Piping Run # Return <br />POLY <br />Equipment Resolution: N/A <br />Piping Run # Vent Piping Run # <br />FIBERGLASS <br />facturer: <br />WESTERN <br />FIBERGLASS <br />WESTERN <br />FIBERGLASS <br />WESTERN <br />FIBERGLASS <br />Piping Diameter: <br />1 " <br />1.5" <br />3" <br />Length of Piping Run: <br />APPROX. 30' <br />APPROX. 30' <br />APPROX. 20' <br />Product Stored: <br />RED DIESEL <br />RED DIESEL <br />DIESEL VAPOR <br />Method and location of <br />iin -run isolation: <br />TEST BOOTS <br />TEST BOOTS <br />TEST BOOTS <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MINUTES <br />15 MINUTES <br />15 MINUTES <br />Test Start Time: <br />8:40 A.M. <br />8:40 A.M. <br />8:40 A.M. <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />9:40 A.M. <br />9:40 A.M. <br />9:40 A.M. <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 HOUR <br />1 HOUR <br />I HOUR <br />Change in Reading (RF-Ri): <br />0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0 PSI <br />0 PSI <br />0 PSI <br />Test Result: 0 Pass Fail ®;- Pass Fail 0 PassFail Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />*Supply, Return and Vent Secondary Piping passed industry standard pressure test. <br />No repairs are needed at present time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.