My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ®Piping Manufacturer ® Industry Standard ❑Professional Engineer <br />❑ Other (Specify) <br />Test Method Uses: ® Pressure ❑ Vacuum <br />❑ Other (Specify) <br />Measuring Equipment Used for Testing: Digital manometer <br />Piping Run #SUPPLY Piping Run #SUPPLY <br />PLASTIC <br />❑ Hydrostatic <br />Piping Run # <br />Piping Material:; PLASTIC <br />Piping Manufacturer: WESTERN <br />Piping Diameter: <br />Length of Piping Run: 30' <br />Product Stored: DIESEL <br />Method and location of TEST BOOT <br />pipin -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and 15 MINUTES <br />starting test: <br />Test Start Time: 10:40 <br />Initial Reading (RO: 5 PSI <br />Test End Time: 11:40 <br />Final Reading (RF): 5 PSI <br />Test Duration: 1 HOUR <br />Change in Reading (RF-Ri): 0 <br />Pass/Fail Threshold: 0 <br />Test Result. M PASS <br />Comments — (include information on repairs made to <br />ermit was obtained or the repairs) <br />WESTERN <br />30' <br />DIESEL <br />TEST BOOT <br />15 MINUTES <br />10:40 <br />5 PSI <br />11:40 <br />5 PSI <br />1 HOUR <br />0 <br />0 <br />PASS <br />facilitate a passing test and indicate whether a <br />Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br />which is generally consistent with testing performed at time of installation. <br />R.C.U.S.T.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.