Laserfiche WebLink
- <br /> ^ SWRCB. January 2OO2 ~�� ~=~ Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 5��dustry Standard <br /> Professional Engineer <br /> Test Method Used: <br /> ressure 11 Vacuum Hydrostatic <br /> L`Other(Speci <br /> Test Equipm ent Used: Equipment Resolution: <br /> ng Run 9 <br /> Piping Run 9 Piping Run 9 <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Lenath of Piping R <br /> Product Stored: fP <br /> Method and location of <br /> pi2ingy-run isolation: <br /> Wait time between applying -bearl"(1 rt:v,5 aw, <br /> pressure/vacuum/water and <br /> starting test: 49 izl Z 0 4f <br /> Test Start Time: q4 0 <br /> Initial Reading(R,): 1141h5- q,145 <br /> Final Reading(RF): <br /> Test Duration: 1.17r <br /> ge in Reading(RF <br /> Pass/Fail Threshold or <br /> Test Result: 52,fas; 0 F-AM 0 Fai] "ass 0 Fail 0 Pass� 0 F'ail <br /> Comments <br /> - <br /> ' <br /> � <br /> � <br />, ^ <br />