My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br /> 5. PEPLNG SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer LAndustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: E Pressure 0 Vacuum ydrostatic <br /> 0 Other(Sped) <br /> Test Equipment Used: �quipment Resolution.- <br /> Sump# Sump 2- <br /> I Sump# Sump# <br /> Sump Diameter: 11 <br /> Sump Depth: <br /> X 1 <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Pi ping.Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of surnp prior to testing: 21- <br /> l <br /> Portion of Sump Tested' el , <br /> Does turbine shut down when <br /> Sump sensor detects liquid(both 'Eyes DNO —./NA 0 Yes 11 No A OYes EINo LENA- OYes ONo DNA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?' E Yes E❑ No 'FTA 0 Yes 0 No 1__5<A 0 Yes `No LZ,'k 0 Yes 0 No 0 NA <br /> Was fail-safe verified to be <br /> ope ational?* E Yes 0 No V4 0 Yes E,No tA 0 Yes 17'No 0 Yes 0 No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: /0 iW/"v <br /> Test Start Time: ZO <br /> Initial Reading(Rj): <br /> Test End Time.- <br /> Final Reading(RF): <br /> Test Duration: 3 0 <br /> Clhanc in Reading (RF-Ri): <br /> P-ass/Fail-Threshold or Criteria: 7,V 5 <br /> Test Result: ass 0 Fail &-Vass 0 Fail "ss D-Fail 0 Pass 0 Fail <br /> Was sensor removed for testina? r kfe s 0 No NA Ples FiNo &I-i D-No OYes ONo ONTA <br /> Was sensor properly replaced and <br /> verified functional after testing?verif 0 No ❑NA des ❑No NA E�re's E No =NA 0 Yes 0 No 11 NA <br /> Comments — (inchicle information on repairs made prior to testing, and reco?yime7idedfollow-up for failed tests) <br /> If the etitii--, depth of the Sump is not tested, specify how much was tested. If the answer to Friv of the questions indicated with an <br /> asterisk (*) is"INO" or"NA", the entire Sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.