My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOT WORK <br /> Hot work may be defined as any operation which-may potentially create a source of <br /> ignition. This operation extremely dangerous when conducted anywhere that a <br /> flammable and/or explosive atmosphere(or fire hazard)may be present. Because <br /> the tanks and pipelines to be removed and scrapped are expected to contain at least <br /> some residues of fuel, sources of ignition shall be eliminated during all operations <br /> that may interact with tank atmospheres. The scope of work dose not require <br /> personnel to perform hot work. <br /> For tank removal operations, all tanks shall be inserted using dry ice at 20 lbs. per <br /> gallon. Tank atmosphere shall be checked using a properly calibrated combustible <br /> gas meter for percent lower explosive limit(0/602)prior to removal from the <br /> ground. Representative samples shall be taken from various locations/levels within <br /> each tank to ensure that the environment is consistent. Prior to lifting, tank <br /> atmosphere must be less than 10 percent LEI,(<10®/J EL)and less than 10 percent <br /> oxygen(<100/602). <br /> SM CONTROL <br /> Site-control procedures for this project shall include the establishment of a work site, <br /> providing site security to warn of unauthorized access and to secure work location <br /> between shifts. Work zones shall be established by the Safety and Health Officer <br /> (SHO). Appropriate work zones including an exclusion zone, decontamination <br /> station and support zone shall be established based on specific conditions of the <br /> work site. An exclusion zone will be established around the immediate work area, <br /> and shall be clearly marked by a combination of traffic cones, barricades and/or <br /> high visibility barrier tape. The exclusion zone shall mark the area where direct <br /> handling operations are occurring and where field personnel may be exposed to <br /> chemical and physical hazards. Entry into the exclusion zone shall be regulated by <br /> the SHO and field Supervisor. No person shall enter an exclusion zone if they <br /> are not wearing the required protective clothing and equipment(i.e. Level). All <br /> personnel existing an exclusion must pass through the decontamination zone, <br /> following the required decontamination procedure. The size and shape of the <br /> exclusion zone shall be based on known and anticipated hazards, type of operation <br /> being performed, physical and typographical features potential for site emergencies <br /> affecting surrounding areas, etc. At the end of each work day, any open excavations <br /> shall be temporarily barricaded in all directions with barricades, and all barricades <br /> connected by barrier tape. A similar procedure shall apply to stockpile soils. <br /> Alternatively, the work area may be secured with chain link fencing. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.