My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLC-5000 Site Controller, LD-2000 and LD-2000 PLC <br /> 5. The submerged pump dispenser switch was shut off and the test was conducted by <br /> the leak detector. <br /> 6. This process was repeated at different temperatures until the requisite number of <br /> tests had been completed over the temperature range specified by the EPA protocol. <br /> A total of 59 tests were conducted in the Monthly/Annual mode on the rigid pipeline. <br /> These tests conformed exactly to the EPA protocol. An abbreviated number of tests <br /> were conducted on the rigid pipeline in the Hourly mode and on the flexible pipeline in <br /> both the Hourly and the Monthly/Annual mode. The abbreviated testing was conducted <br /> at the temperature extremes required by the EPA protocol. This testing was conducted <br /> to verify that the system would perform properly on flexible pipeline and that the 98 LD- <br /> 2000/98 LD-2000 PLC mechanical line leak detector could detect a 3 gal/h leak. A <br /> summary of the tests that were conducted is contained below in Table 1. <br /> Table 1. Summary of the number and types of leak tests. <br /> Test Mode Number of Tests Type of Pipeline Leak Rate <br /> Monthly/Annual 26 200 ft. FRP 0.1 gal/h <br /> Monthly/Annual 30 200 ft. FRP 0 gal/h <br /> Monthly/Annual - Vapor in line 2 200 ft. FRP 0.1 gal/h <br /> Monthly/Annual - Vapor in line 1 200 ft. FRP 0 gal/h <br /> Monthly/Annual 3 215 ft. Flexible 0.1 gal/h <br /> Monthly/Annual 3 215 ft. Flexible 0 gal/h <br /> Hourly 5 200 ft. FRP 3 gal/h <br /> Hourly 5 200 ft. FRP 0 gal/h <br /> Hourly 5 215 ft. Flexible 3 gal/h <br /> Hourly 4 215 ft. Flexible 0 gal/h <br /> Total number of tests 84 <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.