My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLC-5000 Site Controller, LD-2000 and LD-2000 PLC <br /> 5.0 Description of the Vaporless Automatic Line Leak Detector <br /> The official descriptions of the Vaporless equipment and test methods are found in <br /> Attachment A of this report on the appropriate EPA forms. <br /> The Vaporless PLC-5000 Site Controller with the 98 LD-2000 PLC combines an <br /> electronic line leak detector and a mechanical line leak detector to conduct 3 gal/h, 0.2 <br /> gal/h, and 0.1 gal/h leak detection testing. Additional features include interfacing of <br /> dispenser pan sensors, and interstitial sensors, power-line communication, PC/power- <br /> line interface, bidirectional serial data port, and true plug-and-play component <br /> installation and upgrades. The system consists of a site controller central control node, <br /> leak detector node, monitor node, and mechanical line leak detector. <br /> Power lines are used as the communication pathways. Communication can be <br /> transmitted on lines over 5,000 feet, and can be installed to bridge phases on multi <br /> phase powered sites. Using LonWorks® communication protocol, the system can <br /> distinguish separate pieces of equipment and include or ignore information exchanged <br /> between system components. The data transceivers communicate at a bit rate of 5 <br /> kbps and after error correction overhead provide a net bit rate of 4 kbps. <br /> Exchange of information regarding status and control of equipment is facilitated by <br /> application software resident in each system control element, referred to as a "node." <br /> However, under no circumstance can the electronic system disable the mechanical <br /> portion of the leak detection system. <br /> Site Controller Central Control Node <br /> The Central Control Node (CCN) monitors for product dispensing requests: monitors for <br /> Leak Detector Node activity and controls the operation of up to four product turbines; <br /> monitors for activity at up to 16 Dispenser Monitor Nodes; calculates, stores, prints, and <br /> transfers results of electronic line tests; and in the event of a detected 3 gal/h leak, the <br /> CCN will shutdown the associated turbine and issue an appropriate alarm. <br /> The CCN automatically performs monthly and annual precision line leak tests. Tests <br /> may also be manually initiated. Additional features of the CCN include the following: <br /> • Stores up to 99 error messages in its nonvolatile memory. <br /> • Error messages may be printed on the optional printer. <br /> • Information exchange through a bi-directional RS-232 serial port. <br /> • System status viewed on a 2-line by 24-character backlit LCD display. <br /> • Results from 0.2 and 0.1 gal/h tests are time/date stamped (TDS) and recorded <br /> in a log which cannot be cleared. <br /> • A test port is provided for field testing of software and hardware. <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.