My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El <br />the removal of a 22" manwav lid. The ofid <br />OD must be small enough to be removed <br />through a 36" street box. The enclosure <br />body must be capable of joining to the <br />42" or 48" diameter secondary contain- <br />ment collar with a leaktight adhesive joint. <br />The reducer must be capable of joining <br />to the enclosure body with an external <br />leaktight adhesive joint to allow for field <br />installation of the adhesive without <br />entering the enclosure. <br />With the lid installed, the assembly must <br />provide a watertight seal with water up <br />to 12" over the lid. The lid includes a <br />non-skid exterior surface and must be <br />able to support a person standing on the <br />lid without damage to the lid. One of the <br />lid handles is to be offset to aid in the <br />removal of the lid and the other is cen- <br />tered on the lid. Cut lines for field trimming <br />will be marked on the bottom 12" of the <br />enclosure body in 3" increments. <br />11 <br />Model No. <br />Length <br />Model No. Length <br />WTE42-2 <br />2' <br />WTE48-2 2' <br />WTE42-3 <br />3' <br />WTE48-3 3' K. <br />WTE42-4 <br />4' <br />WTE48-4 4' <br />WTE42-5 <br />5' <br />WTE48-5 5' <br />WTE42-6 <br />6' <br />WTE48-6 6' <br />Refer to Section H for the adhesive kit <br />(to bond the enclosure body to the con- <br />tainment collar and to bond the reducer <br />to the enclosure body) and Sections J, K, <br />L and M for the field installed fitting kits <br />(for electrical and plumbing connections <br />to the turbine enclosure). <br />H. Sealed FRP Turbine Enclosure <br />(Model STE Series) - The sealed turbine <br />enclosure consists of a fiberglass <br />reinforced plastic (FRP) enclosure body <br />(variable length, 42" or 48" ID's), an FRP <br />reducer (42" or 48" ID's) with an oval <br />flanged manway (23"x29" ID's), a flat <br />gasket, SS bolts with non -galling silicone - <br />bronze nuts (or optional bolt ring), and <br />an oval FRP lid with handle. The reducer <br />opening must be large enough (minimum <br />28") to allow for the removal of a 22" <br />manway lid. The lid OD must be small <br />enough to be removed through a 36" <br />street box. The enclosure body must <br />be capable of joining to the 42" or 48" <br />diameter secondary containment collar <br />with a leaktight adhesive joint. The <br />reducer with oval flanged manway must <br />be capable of joining to the enclosure <br />body with a leaktight adhesive joint. <br />With the lid installed, the assembly must <br />provide a watertight seal with water up to <br />7' over the lid. The lid may be supplied <br />with an optional 6" NPT fitting with plug <br />which can be used as an observation <br />port. Cut lines for field trimming will be <br />marked on the bottom 12" of the enclosure <br />body in 3" increments. <br />Refer to Section H for the adhesive kit (to <br />bond the enclosure body to the contain- <br />ment collar and to bond the reducer to <br />the enclosure body) and Sections K, L, M <br />and N for the field installed fitting kits (for <br />electrical and plumbing connections to <br />the turbine enclosure). <br />Turbine Enclosure Adhesive Kit <br />(Kit -AD) - When properly installed and <br />cured, the adhesive kit provides a water <br />tight seal to prevent the ingress of water. <br />The adhesive kit includes 1/2 gallon of <br />adhesive in a one gallon capacity can. <br />The kit also includes catalyst (hardener), <br />a wooden mixing stick, a three inch <br />wide plastic putty knife, 60 grit sandpaper, <br />and installation instructions. One adhesive <br />kit is required for each turbine enclosure; <br />the watertight and sealed turbine enclo- <br />sures require two kits. <br />Field Entry Boot - (Model FEB -3 or <br />FEB -4) The FEB -3 or FEB -4 is designed <br />to interface with 3" or 4" nominal <br />OD FRP pipe. <br />FRP Coupling Kit - (Kit FC -3 or FC -4) <br />is designed to interface with 3" or 4" <br />nominal OD FRP pipe manufactured <br />by Ameron or Smith Fiberglass. The <br />coupling ID is tapered at both ends. <br />The two-piece coupling is constructed of <br />fiberglass reinforced plastic and is field - <br />installed using the supplied adhesive. <br />Both pieces of the fitting are threaded <br />together to hold the fitting in position <br />while the adhesive cures. <br />Kit FC -3 or Kit FC -4 includes one 3" or 4" <br />nominal ID FRP coupling, adhesive, <br />catalyst (hardener), plastic mixing stick <br />and applicator, 60 grit sandpaper, and <br />installation instructions. <br />The contractor must provide the hole saw <br />(4-1/2 or 5-1/2 inch OD) or reciprocating <br />saw to cut the hole in the turbine enclo- <br />sure prior to installing the FRP coupling. <br />L. Electrical Coupling Kit - Kit EC -1 is <br />designed to interface with one inch steel <br />electrical conduit. The two-piece coupling <br />is constructed of steel and is field <br />installed using the supplied adhesive. <br />Both pieces of the fitting are threaded <br />together to hold the fitting in position <br />while the adhesive cures. <br />19 <br />Model No. Length <br />Model No. Length <br />STE42-2 <br />2' <br />STE48-2 <br />2' <br />STE42-3 <br />3' <br />STE48-3 <br />3' <br />STE42-4 <br />4' <br />STE48-4 <br />4' <br />STE42-5 <br />5' <br />STE48-5 <br />5' <br />STE42-6 <br />6' <br />STE48-6 <br />6 N <br />Kit EC -1 includes two one inch steel <br />couplings, adhesive catalyst (hardener), <br />plastic mixing stick, 60 grit sandpaper, <br />and installation instructions. <br />The contractor must provide a two <br />inch hole saw or reciprocating saw to <br />cut the hole in the turbine enclosure <br />prior to installing the steel coupling. <br />Secondary Containment Collar - The <br />secondary containment collar shall be <br />constructed of fiberglass reinforced plastic <br />Collar shall be 42" or 48" in diameter and <br />will be factory -installed in accordance <br />with drawings. The collar will include a <br />sensor mounting bracket. <br />Containment Collar Sensor is pre - <br />assembled and ready to wire. All <br />electrical components must be U.L. <br />listed or accepted. This float switch <br />sensor is capable of detecting a 2" or <br />more accumulation of liquid (water or <br />product) in the turbine enclosure. <br />The float switch is constructed of Buna-N; <br />the float switch is housed in plastic <br />casing and includes a mounting clamp. <br />O. Ladders - Ladders shall be the standard <br />ladder supplied by the tank manufacturer <br />(carbon steel, stainless steel, aluminum). <br />Refer to drawings for location. <br />P. Tank Lifting Lugs - Provide lifting lug(s) <br />on all tanks. Lifting lug system shall be <br />capable of withstanding weight of tank <br />with a safety factor of 3:1. <br />0. Probe Drawstring - Nylon line shall be <br />150 Ib. break strength located at the <br />monitoring fitting nearest the end of the <br />tank. When a reservoir is located at this <br />position, the drawstring shall be installed <br />within the reservoir. Drawstring length will <br />allow for a 7' tank burial depth. <br />R. Fittings Threaded — NPT <br />1. All threaded fittings on U.L. labeled tanks <br />shall be located in a manway lid or a tank <br />mount within 12" of the tank top center <br />line and be constructed consistent with <br />the requirements of the U.L. label. <br />Fittings to be supplied with threaded <br />cast iron plugs. <br />2. All standard threaded fittings to the pri- <br />mary tank and monitoring cavity are 4" <br />in diameter. The standard secondary <br />containment coupling is 6" in diameter. <br />All standard threaded fittings are half <br />couplings. Reducers are to be used <br />for smaller sizes where specified and <br />provided by contractor. <br />3. Thread Standards — All threaded <br />fittings shall have machine tolerances <br />in accordance with the ANSI standard <br />for each fitting size. <br />4. Strength — Primary tank NPT fittings will <br />withstand a minimum of 150 foot-pounds <br />of torque and 1,000 foot-pounds of bend- <br />ing, both with 2:1 factor of safety. <br />5. Sizes Standard Reducer Sizes <br />Inlet 4" <br />Outlet 4" <br />Vent 4" <br />Gauge 4" <br />Fill 4" <br />6. Location — Refer to drawings <br />for location. <br />7. Suction Line — Shall be installed on <br />site by the contractor. Diameter of pipe <br />and grade and schedule as called out <br />in other sections. <br />8. Return Line — Shall be installed on the <br />site by the contractor. Diameter of pipe <br />and grade and schedule as called out in <br />other sections. <br />9. All rigid internal piping shall be terminated <br />at least 4" from the bottom of the tank. <br />3.01, 3.02 Installation And Testing <br />Tanks shall be tested and installed according <br />to the current installation instructions provided <br />with the tank (refer to Fluid Containment <br />Pub. No. INST 6001 and include as part <br />of your specification). <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.