Laserfiche WebLink
SWRCB, January 2002 Pae of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specie) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />$ ,A:?(' O�1/ 3 <br />l „ i'l,'///, <br />Sump # 87Sump <br />'.✓//'... -=.`d"' <br /># 91 <br />w.: Y.s 7rnF. „W. .x <br />Sump # DSL <br />,-s-fZ,%'- <br />Sump # <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?` <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />ailf <br />Was ail -safe verified to be <br />o s nal?# <br />[]Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes El No El NA <br />11 Yes 11 No [INA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass []Fail <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑Yes ❑ No ❑ NA <br />[]Yes❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />El Yes 11No 11NA <br />Comments — (include information on repairs made prior to testing, and recommended frllow-up for failed tests) <br />NO TEST. SECONDARY BOOTS NEED TO BE REPLACED <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer t(. y of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />