Laserfiche WebLink
SWRCB, January 2002 0 0 <br />5. SECONDARY PIPE TESTING <br />Page -3 Of -4 <br />Test Method Developed By: ❑ Piping Manufacturer 9 Industry Standar( ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: OePressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # 87 <br />Piping Run# 91 <br />Piping Run # DSL <br />Piping Run# <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />31' <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />100, <br />Product Stored: <br />Method and location of <br />piing-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />NO TEST. BOOTS NEED TO BE REPLACED. <br />