My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_2004-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 4:32:43 PM
Creation date
6/3/2020 9:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2012
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_2004-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 0 0 <br />5. SECONDARY PIPE TESTING <br />Page -3 Of -4 <br />Test Method Developed By: ❑ Piping Manufacturer 9 Industry Standar( ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: OePressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # 87 <br />Piping Run# 91 <br />Piping Run # DSL <br />Piping Run# <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />31' <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />100, <br />Product Stored: <br />Method and location of <br />piing-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />NO TEST. BOOTS NEED TO BE REPLACED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.