Laserfiche WebLink
09/11/2012 11:57 (209)465-4988 MaryAnn Henderson Page 2/3 <br /> 0 <br /> SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard D Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> is Other(Spec) <br /> Test Equipment Used:NITROGEN Equipment Resolution:PSI <br /> Piping Run#REG Piping Run#SUPER Piping Run#DIES Piping Run <br /> Piping Material: FIBER FIBER FIBER <br /> Piping Manufacturer UNK UNK UNK <br /> Piping Diameter: 3" 311 311 <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: GASOLINE GASOLINE GASOLINE <br /> Method and location of BOOTED/SUMPS BOOTED/SUMPS BOOTED/SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1200 1300 <br /> Initial Reading(Rj): 4 PSI 4 PSI <br /> Test End Time: 1300 1400 <br /> Final Reading(RF): 4 PSI 4 PSI <br /> Test Duration- I HR. I HR. <br /> Change in Reading(RF-R): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: 0 Pass 0 Fail X Pass 0 Fail X Pass D Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up for ailed tests) <br /> Regular Secondary Line not test 'C�* <br /> I <br /> Zavr -11"At�wv pd.4/ev4di-a- Zz� C491�202 A,0-0-r- <br />