Laserfiche WebLink
Annual UST System Inspection Record <br />Facility: Bank of Stockton, Airport Date' 1/8/01 <br />Dispenser / Suction Pump <br />29. Inspect each hose -to -nozzle <br />assemble for damage and <br />A106 w leakage. t� erify operation <br />of each hose retractor or <br />hose reel. <br />30. Remove panel(s) from each <br />dispenser i suction pump <br />and verit- unit is firmly <br />anchored to fuel island. <br />31. Follovving panel removal, <br />inspect product piping. <br />emergence shear valve. and <br />fuel filter for damage and <br />leakage. Does fuel filter <br />cartridge need replacing? <br />Capacity <br />Product <br />'IT, S <br />X <br />NO <br />N/A <br />Remarks <br />X <br />PAGE 12 <br />