Laserfiche WebLink
IV <br />v <br />13 <br />FacilitN-: Bank of Stockton, Airport <br />Dispenser / Suction Pump <br />�2. Perform calibration of each <br />dispenser suction pump <br />meter. Attach calibration <br />results to this inspection <br />record. <br />Feel / Satellite Island <br />Inspect each fuel satellite <br />island, lighting assemble. <br />and bumper post for <br />damaize. <br />i <br />f <br />34. Activate emergence shutof: <br />switch new fuel island(s). <br />Is electrical power to each <br />tank system terminated <br />when switch is activated? <br />Date: 1/8/01 <br />Capacity Product Y"ES NO N/A Remarks <br />x <br />Capacity Product YES NO N/A Remarks <br />x <br />x <br />PAGE I <br />