Laserfiche WebLink
16:3© 2094 433 <br />FIFTH FLOOR <br />10. Contact EHD for the following inspections: <br />a. Primary piping <br />b. Secondary piping <br />c. 24 hour lake test on sumps or equivalent test <br />d. Verify "safe suction" <br />e. Final inspection <br />10. Any changes in information or scope of work must be submitted to EHD prior to <br />commencing work. <br />11. A final inspection must be performed prior to returning the UST system to <br />Operation. <br />12. Submit an As -Built plan to EHD at the time of the final inspection. Note: A final <br />inspection will not be performed unless the as-builts are submitted. <br />13. Submit a Form B and Monitoring and Response Plan for this facility. <br />Schedule all appointments 48 hours in advance. <br />This permit expires on 3/28/05. <br />If you have any questions please contact me at (209) 468-9848. <br />Thank you, <br />Ray von Flue, R.E.H.S. <br />Senior Registered Environmental Health Specialist <br />PAGE 03 <br />