My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 REC"ED <br />JUL 13 2015 a 7 <br />SWRCB, January 2002 Page of <br />6. PIPING SUMP <br />Test Method Developed By: IJ Sump Manufacturer x Indu VOC S CJ Professional Engineer <br />J Other (Specify) <br />Test Method Used: iJ Pressure Li Vacuum A Hydrostatic <br />L, Other (Spec) <br />Test Equipment Used: Caldwell <br />Equipment Resolution: +1-0.0025" <br />Sump # 1 Sump # Trasnision <br />Sump # Sump # <br />Sump Diameter: 42 <br />50" <br />Sump Depth: 36" <br />36" <br />Sump Material: Fitenitass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: 14" <br />20" <br />Height from Tank Top to Lowest <br />Electrical Penetration: 18 <br />1a" <br />Condition of sump prior to testing: rood <br />rood <br />Portion of Sump Tested' 20• <br />22" <br />Does turbine shut down when ❑ Yes ❑ No CAA <br />sump sensor detects liquid (both <br />V, Yes E)No L --*A <br />1-i Yes [1. No U NA <br />❑ Yes L� No ❑ NA <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe tJ Yes i_1 No XNA <br />Yes L No SNA <br />[? Yes ❑No NA <br />L, Yes C7 No [INA <br />shutdown * <br />Was fail-safe verified to be [] Yes 1-INo '_XNA <br />=Yes No i MAl <br />1 Yes ❑ No 0 NA <br />ElYes L]No L -j NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: 1oNn <br />15n*r. <br />Test Start Time: 1:00 <br />11:00 <br />Initial Reading (111): 1 drde <br />1 drde <br />Test End Time: 1:30 <br />11:30 <br />Final Redding (RF): 1 Cirde <br />1 Cirde <br />Test Duration: 30 aAins <br />so wins <br />Change in Reading (RF-Rr): 0 <br />0 <br />Pass/Fail Threshold or Criteria: -•0025' <br />*1-0.0025 <br />Test Results i ?( Pass Fail <br />X Pass E: Fain <br />I-] Pan i ;Fail <br />-1 Pass 1, ; Fail <br />XYes !No FINA <br />Was sensor removed for testing? <br />IXYes t I No `INA <br />0 Yes "No I= INA <br />I I Yes iNo LJ NA <br />Was sensor properly replaced and FXYes 7 No ;INA <br />i X,c [7 No u NA <br />❑ Yes ? No i 7 NA <br />❑ Yes O No i -i NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />trested v&h cakMaN tester to verify test <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.