My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:00:31 PM
Creation date
6/3/2020 9:54:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Industry <br />RE"VED <br />JUL 13 2015 <br />Page 3 of 7 <br />5. SECONDARY PIPE TH <br />Li Piping Manufacturer I")Industry Stan ar C i Professional Engineer <br />G Other (Sped) <br />Test Method Used: <br />`?(Pressure Vacuum _:. Hydrostatic <br />Other (Spec) <br />Test Equipment Used: PSI Gauge <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # PRIM Piping Run # <br />FIBER FIBER <br />RETUR <br />4 Piping Run # VAPOR Piping Run # <br />FIBER <br />Piping Manufacturer: <br />SMITH SMITH <br />SMITH <br />Piping Diameter: <br />4" 3" <br />3" <br />Length of Piping Run: <br />sol W <br />so' <br />Product Stored: <br />JPs JPs <br />,Ps <br />Method and location of <br />piping -run isolation: <br />BOOT BOOT <br />BOOT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 Min. 10 Min. <br />10 Min. <br />Test Start Time: <br />10 AM 10 AM <br />10 AM <br />Initial Reading (RI): <br />3 PSI 3 PSI <br />3 PSI <br />Test End Time: <br />11 AM 11 AM <br />11 AM <br />Final Reading (RF): <br />3 3 <br />3 <br />Test Duration: <br />1 HR 1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16th PSI 1/16 <br />1/16 <br />d est Resu4tt' <br />x Pass�j Fail EX Pass ;Fail <br />?i Pass C, Fail i-; Pass ` ,I Fal <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />Pressure tested secondary atter putting Boots back in test position. <br />
The URL can be used to link to this page
Your browser does not support the video tag.