Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Industry <br />RE"VED <br />JUL 13 2015 <br />Page 3 of 7 <br />5. SECONDARY PIPE TH <br />Li Piping Manufacturer I")Industry Stan ar C i Professional Engineer <br />G Other (Sped) <br />Test Method Used: <br />`?(Pressure Vacuum _:. Hydrostatic <br />Other (Spec) <br />Test Equipment Used: PSI Gauge <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # PRIM Piping Run # <br />FIBER FIBER <br />RETUR <br />4 Piping Run # VAPOR Piping Run # <br />FIBER <br />Piping Manufacturer: <br />SMITH SMITH <br />SMITH <br />Piping Diameter: <br />4" 3" <br />3" <br />Length of Piping Run: <br />sol W <br />so' <br />Product Stored: <br />JPs JPs <br />,Ps <br />Method and location of <br />piping -run isolation: <br />BOOT BOOT <br />BOOT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 Min. 10 Min. <br />10 Min. <br />Test Start Time: <br />10 AM 10 AM <br />10 AM <br />Initial Reading (RI): <br />3 PSI 3 PSI <br />3 PSI <br />Test End Time: <br />11 AM 11 AM <br />11 AM <br />Final Reading (RF): <br />3 3 <br />3 <br />Test Duration: <br />1 HR 1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />0 0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16th PSI 1/16 <br />1/16 <br />d est Resu4tt' <br />x Pass�j Fail EX Pass ;Fail <br />?i Pass C, Fail i-; Pass ` ,I Fal <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />Pressure tested secondary atter putting Boots back in test position. <br />