Laserfiche WebLink
SWRCB, January 2002 <br />Rg"VED <br />JUL 13 2015 Page 7 of 7 <br />9. SPILLIOVERFILL CONTAIN XES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested t_1 <br />Test Method Developed By: r; Spill Bucket Manufacturer I Andustry Standard L; Professional Engineer <br />F] Other (Specify) <br />Test Method Used: <br />; � Pressure Vacuum iydrostatic <br />ID Other (Specie) <br />Test Equipment Used: Tape Measure Equipment Resolution: <br />ffiffilm <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />TWaittimerapplying <br />14.50 <br />19" <br />pressure/vacuum/water and <br />starting test: <br />10mins <br />Test Start Time: <br />1100 <br />Initial Reading (R,): <br />183/8 <br />Test End Time: <br />1200 <br />Final Reading (RF): <br />183/8 <br />Test Duration: <br />1 hr <br />Change in Reading (RF=Rj): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16 <br />Test Result: <br />�CPass is Fall - Pass U,' Fail -- Pass ',-1 Fail Pass <br />Comments — (include information on repairs made prior to testing, and recommende(follow-up for failed tests) <br />