My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:45:39 PM
Creation date
6/3/2020 9:54:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1998-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May-1 2004 12:12pm From-CONOCOPH I S ENV COMPLIANCE 510 245 5179 T-777 P.002/003 P-026 <br /> Unit ConocoPhillips Co.2611194 ACQ#: 11194 <br /> Operator Name: HUYENTHANH T PHAN <br /> Address. 2375 TRACY BLVD <br /> TRACY,CA 953 76 <br /> UNDERGROUND STORAGE TANKS(UST)OWNER/OPBRATOR AG MEN'S' <br /> California Underground Storage Tank Regulations(CCP,Title 23,Division 3,Chapter 16,Article 2,Section 2620(b)),require <br /> ConomPhillips(the tank owner)to execute a written agreerim.t with their Dealers,(the tank operators),requiring Them to <br /> monitor the underground storage ranks(USTs)containing hazardous substances. <br /> PART 1,OWNER CERTIFICATION <br /> ConocoPhillips Company,as owner of the USTs at the above site,certifies that; <br /> 1. It is not the tank operator of the USTs at said site. <br /> 2. IT has applied for the UST permit,and a valid UST permit is on-site or will be delivered to the tank operator when <br /> received from the local implementing agency_ <br /> 3. It will notify the loco implementing agency of any operator change within thirty(30)days of any such change. <br /> 4. Both ConoodPhillips and the operator have signed this,Agreement. <br /> PART11:OPERATOR CERTIFICATION <br /> The law requires the tank operator of USTs containing trictor vehicle fuel to comply with the following Standards, <br /> I. A valid UST permit shall be maintained on site. <br /> 2- A UST Monitoring Program,approved by the local implementing age-acy,must be implemented. <br /> 31 A Spill Response Plan,approved by the local implementing agency,must be implemented. <br /> 4. The requirements stipulated in the UST Monitoring Program and Spill Response Plan(attached),must be complied <br /> with- nis shall include,if necessary,the submittal of an annual written statement to the local implementing agency, <br /> verifying under penalty of perjury that all monthly monitoring reports were summarized,and that all dam contained <br /> within the monitoft reports are within allowable variations. Alternatively,a listing of the times,dates and <br /> corresponding monitoring report data that exceeded the allowable variations must be provided. <br /> 5. Tho monitoring and maintenance records must be maintained. This includes inventory readings and reconciliation <br /> records,sampling and testing results,all of which mpg be maintained on-site for at I=t I years,or in an approved <br /> of-site location. Said records must be made available upon request,within 36 hours,to the local implementing <br /> agency or the Stite Water Board. <br /> 6. Records must be kept in sufficient detail To enable the local implementing agency,at any time,to determine that thr, <br /> tank operator has undertaken all n=itoring activities required by the UST Permit to Operate and/or the UST <br /> Monitoring Program. <br /> 7, Conocoftillips must be notified of the detection of any unauthorized releases by the fastest moons available(no later <br /> than 8 hours)or wilbla The dyne frame mandated by the local implementing agency. The operator must adhere to the <br /> procedures contained in the Spill Response Plan, ConocoPhillips will notify the appropriate agency(s)and submit a <br /> written report as maybe required by the agency(s), <br /> 9. Daily inventory measurements must be performed by a trained facility operator or designated facility personnel for <br /> each day The facility is in operation. <br /> 9. ConacoPhillips must be notified of any malfunctioning of the UST monitoring system. The monitoring equipment <br /> shall be operated and maintained in accordance with the regulation per Title 023,Division 3,Chapter 16,Article 4, <br /> Section 2641 0)of the California Code of Regulation. <br /> CostCanter#2611194, HUYENTHANH THI PHAN,2375 TRACY BLVD,TRACY,CA 95376 <br /> Date Printed: 1111=043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.