My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:45:39 PM
Creation date
6/3/2020 9:54:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1998-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> ti <br /> Site Address: 12,3 7 S Qt6l rfl Date of Testing/Servicing: <br /> D. Results of Testing/Servicing <br /> -Software Version Installed: 1A !j j <br /> Complete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> -Yes ❑ No* Is the visual alarm operational? <br /> ❑ Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> C�rYes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ N/A operational? <br /> 0--Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply)XfSump/Trench Sensors; JkDispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? V?Tes; ❑No. <br /> ❑ Yes ❑ Into* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ,19,N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> 6 Yes* ❑ No' Was any monitoring equipmentzeplaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* 8 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes, describe causes in Section E,below. <br /> J,Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? <br /> AZ Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: L 1 k M e,elL <br /> w/4 5- `t/A/ <br /> /1 �ihc n. 7P1S6� C✓i a zGII yi 4 - <br /> _ / <br /> /t�bX/ yrb.Q i A/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.