Laserfiche WebLink
r` Monitoring System Certification _ <br /> Site Address: ,)3 7 5 <br /> AC L G Date of Testing/Servicing: 1� /3 <br /> F. In-Tank Gagging/SIR Equipment: ] Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies Nvere or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> —45:7y—es ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> C1 N/A (Check all that apply) Simulated leak rate:�4 3 g.p.h.'; ❑ 0.1 g.p.h.Z; ❑ 0.2 g.p.h.'- <br /> Notes: 1. Required for equipment start-up certification and annual certification.- <br /> 2. <br /> ertification:2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ I,e Was the testing apparatus properly calibrated?. <br /> Yes ❑—No*. For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> SR N/A '%, <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 6-N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine-automatically shut off if any portion of the monitoring system <br /> Pk NIA malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> tt�NIA <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies Nvere or will be corrected. <br /> H. Comments: <br />