Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 23 7 S5 AG G 2� C <br /> . . . . . . . . . .1(. . . . . . . . . �f �: : . . . . . . . . . . . . : . <br /> . . . . . . . . . . . . . . . . . 5� .. . oati. . . : 9 �: S.¢'.' . . . . . . . . <br /> . . . . <br /> . . . . . . .J. ". . . . . . . . . . . . . . . . . . <br /> . . . . . . . . I. . . . . . <br /> n.... . . LE7 . . . . . . . . . . .Cud <br /> C��. . . . . . :�. . . . . . . . . . . <br /> Date map was drawn: ;y /3 6 2 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pang` spill containers, or other secondary containment areas; <br /> mechanical or electronic line leak detectors; and in-�ank liquid level probes (if used for leak detection). In the <br /> space provided, note the date this Site Plan was prepared. <br /> CALNI-02 Page of 11/15/99 <br />