Laserfiche WebLink
UCSB04N-2611194 Page 2 of 3 <br /> 4. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer N Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: N Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: DUAL 3"PRESSURE GAUGES Equipment Resolution: <br /> Piping Run 87 Piping Run 91 Piping Run Piping Run <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: APPROX. 150' APPROX. 150' <br /> Product Stored: 87 91 <br /> Method and location of NA NA <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 1 HOUR 1 HOUR <br /> starting test: <br /> Test Start Time: 10:25 10:10 <br /> Initial Reading(RI): 5 PSI 5 PSI <br /> Test End Time: 11:25 11:10 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 1 HOUR 1 HOUR <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: N Pass ❑;Fail N 'Pass ❑Fail' ❑ Pass' .- ❑Fail ❑ Pass ❑';Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />