My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IH AFETY <br />00 <br />* Heat Stress <br />* Open Excavation <br />* Heavy Equipment <br />* Slip, trip and fall hazards <br />* Electrical Hazards <br />* EPA Level D <br />* EPA Level C (Organic vapor cartridge respirator.) <br />6111110411 <br />Barriers and signs shall be installed around the open excavation. Signs shall state "NO <br />SMOKING." <br />Due to the presence of flammable materials and substances on the site, <br />proper housekeeping practices will be followed. These include storing debris <br />in a designated location for removal, job -site cleanup at the end of each day, <br />and storage of hazardous materials according to Tait's existing practices and <br />procedures. <br />Tait shall have the appropriate fire extinguisher equipment on the job prior to the start <br />of the project. No cutting torch, open flame, or spark producing equipment shall be <br />used on the tank or piping at any time. Any source of ignition shall be at least 50 feet <br />away from the excavation site. <br />A properly calibrated flammable/combustible gas and oxygen analyzer is required on <br />the job site prior to excavation or removal. Calibration of the meter must be within the <br />last three months. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.