Laserfiche WebLink
SECONDARY PIPE TESTING <br /> Y. G3 Manufacturer ;..:i°trCdusEry Starui�sd f Prnf�ssEona[. ngr p "hdr.(seebelow) <br /> ..::::.:.:.... <br /> ;. <br /> T S $t�1atd 11se5 ,:;:,�.PresSLre::: p Uacuum Q 1 I bstahc ' C?th r(see elc>w) <br /> I lead rr c{ fp;rr en il�� ..-P.--c$ sure.Gauge �r�o���o to�m .1 <br /> amen <br /> good ,::.: P� in :Rln. :;::: .;.. PiiR <br /> Pipe Manufacturer <br /> Smith Smith Smith <br /> Pipe Type FRP FRP FRP <br /> Z.inches 2 <br /> Primary Pipe Diameter( ) 2" <br /> inches " <br /> Secondary Pipe Diameter( ) 3" 3" 3 <br /> '<Product Stored <br /> Gasoline-87 Gasoline-89 < Gasoline-91 <br /> Method of secondaryi isolation Termination Boot Termination Boot Termination Boot <br /> pPe <br /> Sum <br /> i e <br /> Location of secondary p p isolation sump Sum <br /> P P <br /> <>Estimated length of piping run(feet) <br /> 80' 90' 70' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize(hr:min) 0:12 <br /> 0:18 0:08 <br /> Test start time <br /> 9:07 AM 9:06 AM 9:08 AM <br /> Initial pressure(Psig) 5 5 5 <br /> Test end time 10:07 AM 10:06 AM 10:08 AM <br /> Final <br /> pressure(P 9)si 5 5 5 <br /> Test duration hours:minutes) 1:00 1:00 1:00 <br /> Change in pressure si 0 0 0 <br /> 9 P (P 9) <br /> Pass/Fail threshold(Psi9) 0.5 0.5 0.5 <br /> PASS E <br /> PA <br /> S <br /> TEST RESULT SS PASS <br /> S <br /> Comments: <br /> 0 2002 Walton Engineering,Inc. <br />