Laserfiche WebLink
• • <br /> For tanks with a 3 inch or larger fillpipe inside diameter, <br /> • the average product temperature is measured with a temperature <br /> coil and meter, described above. <br /> 5 .0 Test Results/Data <br /> The tank test results for those tests conducted to date are <br /> summarized on Table 1 . The specific data collected for each test <br /> is shown on the worksheet in Appendix I . A copy of the liquid <br /> level/pressure recording is also attached for the Horner EZY-CHEK <br /> method. <br /> A Certificate of Compliance for each tank that passed the <br /> 0.05 gal/hour leak rate specification is provided in Appendix II . <br /> • <br /> The results of tank tests or tank/piping system tests that <br /> did not pass or gave inconclusive results are discussed below. <br /> The data sheets for these tests is provided in Appendix III . <br /> 5.1 Inconclusive/Failed Results <br /> Livermore Facility <br /> Tank 231-11D This 3,200 gallon diesel tank has a manway, which <br /> had not been vented and filled with product before the required <br /> eight hour temperature stabilization period. Thus product was <br /> added immediately before conducting the Horner EZY-CHEK method. <br /> • The resulting test data showed an inconsistent trend in the last <br /> -6- <br />