My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:02:44 AM
Creation date
6/3/2020 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1987 PRECISION TESTS
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_1985-1987 PRECISION TESTS.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> For tanks with a 3 inch or larger fillpipe inside diameter, <br /> • the average product temperature is measured with a temperature <br /> coil and meter, described above. <br /> 5 .0 Test Results/Data <br /> The tank test results for those tests conducted to date are <br /> summarized on Table 1 . The specific data collected for each test <br /> is shown on the worksheet in Appendix I . A copy of the liquid <br /> level/pressure recording is also attached for the Horner EZY-CHEK <br /> method. <br /> A Certificate of Compliance for each tank that passed the <br /> 0.05 gal/hour leak rate specification is provided in Appendix II . <br /> • <br /> The results of tank tests or tank/piping system tests that <br /> did not pass or gave inconclusive results are discussed below. <br /> The data sheets for these tests is provided in Appendix III . <br /> 5.1 Inconclusive/Failed Results <br /> Livermore Facility <br /> Tank 231-11D This 3,200 gallon diesel tank has a manway, which <br /> had not been vented and filled with product before the required <br /> eight hour temperature stabilization period. Thus product was <br /> added immediately before conducting the Horner EZY-CHEK method. <br /> • The resulting test data showed an inconsistent trend in the last <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.