My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:02:44 AM
Creation date
6/3/2020 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1987 PRECISION TESTS
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_1985-1987 PRECISION TESTS.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank 411-11D This 10 ,000 gallon diesel tank and piping system <br /> showed a product volume loss greater than -0.055 gal/hour. A low <br /> • level Horner test of the "tank only" showed the tank to be "pro- <br /> duct tight" within the acceptable compliance limits. The conclu- <br /> sion reached is a likely leak in the piping system. It may be <br /> possible to line test the product delivery pipe, if the check <br /> valve does not leak. A product line pressure test is recom- <br /> mended. <br /> Tank 490-41D This 2 ,000 gallon diesel tank and piping system <br /> was tested by both the PETRO TITE and Horner EZY-CHECK methods . <br /> The PETRO TITE conducted first showed a product volume loss of <br /> -0.354 gal/hour. The Horner low level test of the "tank only" <br /> showed the tank "product tight" with a result of -0.004 gal/hour. <br /> • A product line pressure test is recommended. <br /> Site 300 Facility <br /> Tank 815-11D This 10,000 gallon diesel tank and piping system <br /> was tested by the Horner EZY-CHEK method and showed a product <br /> volume gain greater than 0.02 gal/hour . This result is inconclu- <br /> sive and indicates unsatisfactory test conditions, such as : pro- <br /> duct line check valve leaking product into the tank, groundwater <br /> leaking into the tank, or a vapor pocket expanding during the <br /> test . A standpipe test procedure can, in some cases , overcome <br /> the influence of the above conditions. <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.