My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:02:44 AM
Creation date
6/3/2020 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1987 PRECISION TESTS
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_1985-1987 PRECISION TESTS.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The standpipe test was conducted and a leak in the above <br /> ground pipe system was located. The product loss from the pipe <br /> leak was collected during the test period and accounted for in <br /> the test results which showed a product volume loss estimated to <br /> be approximately -0.033 gal/hour. <br /> Unfortunately, the test data for this tank and four others <br /> tested the same day were stolen from a vehicle overnight along <br /> with some other equipment. <br /> A retest of this tank system is recommended after correcting <br /> the above ground pipe leaks. <br /> Tank 827-11D This 8,000 gallon diesel tank and piping system <br /> was tested by the Horner EZY-CHEK method. The tank manway cover <br /> would not seal , and therefore, the system leaked -0.066 gal/hour. <br /> A low level test indicated the tank below the manway cover was <br /> "product tight". A retest of this system is recommended when the <br /> manway cover is properly sealed. <br /> Tank 865-11D This 4,000 gallon diesel tank and piping system <br /> was tested by the Horner EZY-CHEK method . A significant above <br /> ground leak was noted and could not be corrected at the time. A <br /> low level test was attempted, but was inconclusive due to <br /> excessive product gain (+0.02 gal/hour) . It is possible that <br /> this gain was product draining back into the tank. A retest of <br /> this system is recommended when the pipe leak is repaired. <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.