My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 11
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 2:48:03 PM
Creation date
6/3/2020 9:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 11
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 11.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Subcontractor shall provide all labor, materials, 1equipment, and permit-, <br />required to repair leaks at existing diesel fuel Undergro',md Storage Tank (USTP) <br />secondary containments locatedat the University's ;r�more Site and SitII <br />e 300. <br />verification of repair and <br />shall provide leak testing documentation to LLNIL's 71"�echnical Representative <br />upon completion of repair and testing. The Subcontract,' <br />all permits, permit fees, and reviews, as required by L and State, City and <br />Local Authorities. All training and certification th;4 may be required by <br />authorities shall be provided by the Subcontractor. 11 <br />The Subcontractor shall provide a work schedule, with, I I <br />the start of on-site work. The Subcontractor shall provide information on <br />materials to be used to LLNL for review and approval on all new installations. As <br />may be requested by the University's Technical Repres <br />shall provide one -line as -built drawings and sketches. <br />111, WC -1A . k7l IWITTUT"M74711M.4 �t LLN . Temporary futil <br />tanks and back-up generators are not included and will e provided by LLNL, ff <br />required. <br />The Subcontractor shall coordinate and perform work 4'nder LLNL Inspectors, <br />Project Managers, and Coordinator. "'I <br />TASKS <br />The Subcontractor shall perform the following tasks t the stated University <br />locations: <br />The Subcontractor shall mobilize to the site and access i�ie UST sump. Once the <br />sump has been checked by LLNL personnel for air qi,ality the Subcontractor <br />shall enter the sump and sump penetrations and — VAT11f <br />re -test the sump. <br />MEARM <br />The Subcontractor shall mobilize to the site and access 6e UST sump. Once the <br />sump has been checked by LLNL personnel for air q1 11 tality, the Subcontractor <br />shall enter the sump, seal all man-way/sump bolt pen(Arations, and re -test the <br />sump. <br />Statement of Work Dated February 12, 2003 <br />Subcontract No. B530341 Page 1 of 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.