Laserfiche WebLink
• <br />Building 871 — Replace Piping and Re -test <br />The Subcontractor shall mobilize to the site, flush, and <br />and replace it with doubled wall flexible fuel line. <br />provide new sump penetrations and required leak testis <br />Health Services Agency (SJCHSA) may require a third 1 <br />the repair is complete, which the University would obtaii <br />expected to be shut down for one day. <br />Building 875 — Repair Overfill Box and Re -test <br />The Subcontractor shall mobilize to the site and access, <br />the drain valve, re -tighten the fill pipe stub, and re -test. <br />and Retest <br />The Subcontractor shall mobilize to the site, demolish <br />UST, and excavate to the top of the tank. The Subo <br />existing overfill, sump and piping, and flush with watf <br />The Subcontractor shall replace the overfill box, <br />Subcontractor shall provide all the required leak testir <br />grade with existing excavated material, and then rel <br />match the existing slab. SJCHSA may require a third <br />the repair is complete, which the University would o <br />System will be shut down during the repair work. <br />Statement of Work <br />Subcontract No. B530341 Page 2 of 2 <br />• <br />remove the existing hose ' 6 l <br />The Subcontractor shall r e J <br />ig. San Joaquin County, <br />arty full system test after <br />. Building 871 system is _ LlA/f-- <br />the overfill box, replace <br />to concrete slab over the <br />tractor shall remove the <br />and dispose of properly. <br />imp and piping. The <br />and backfill the UST to <br />Lce the concrete slab to <br />arty full system test after <br />ain. Building 882 UST <br />Dated February 12, 2003 <br />