Laserfiche WebLink
P y <br />" <br />tb .w -CS i <br />STATE OF CALIFORNIA = °o <br />STATE WATER RESOURCES CONTROL BOARD ; + 0 <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B " �� =: <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. ��"•'"" <br />MARK ONLY ❑ 1 NEW PERMIT <br />❑ <br />3 RENEWAL PERMIT ® 5 CHANGE OF INFORMATION <br />❑ 7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT <br />❑ <br />4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE <br />❑ 8 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />Lawrence Livermore National Laboratory Site 300 <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN <br />A. OWNERS TANK L D. a 882-DlUl <br />B. MANUFACTURED BY:MOdern Welding CO. , Inc. <br />C. DATE INSTALLED (MO/DAY/YEAR) 1988 <br />D. TANK CAPACITY IN GALLONS: 1500 <br />IL TANK CONTENTS IF A-1 IS MARKED. COMPLETE ITEM C. <br />A� ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />® 2 PETROLEUM ® 60 EMPTY <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />e. <br />® 1 PRODUCT <br />2 WASTE <br />C. <br />la REGULAR UNLEADED a 3 DIESEL ❑ 6 AVIATION GAS <br />ib PREMIUM UNLEADED Q 4 GASAHOL❑ 7 METHANOL <br />to MOGRADE UNLEADED 5 JET FUEL ❑ 8 M85 <br />❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED Diesel C. A. S. #: N/A <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. B. AND C. AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF <br />02 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR UNER <br />❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />CD 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />® 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(P6M" Tack) <br />Q 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />® 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />❑ 5 GLASS LINING <br />® 6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES _ NO_ N/A <br />D. EXTERIOR <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />CORROSION <br />PROTECTION <br />® 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />❑ 95 UNKNOWN <br />❑ 99 OTHER Steel Clad with FRP <br />E. SPILL AND OVERFILL etc. SPILL CONTAINMENT INSTALLED (YEAR) -1,QAR OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />+ DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br />IV. PIPING INFORMATION <br />/A <br />CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND. BOTH IF APPLICABLE * Positive shut -of f valve in drop tube <br />A. SYSTEM TYPE <br />A U <br />i Sumo) <br />A U 2 PRESSURE &U) <br />3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A& 2 DOUBLE WALL A U <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U 2 STAINLESS STEEL A U <br />A U 6 CONCRETE A U <br />A U 10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC) A I) 4 FIBERGLASS PIPE <br />7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br />A U 95 UNKNOWN A U 99 OTHER <br />D. LEAK DETECTION <br />❑ <br />I MEO CAL LME LEAK ❑2 <br />UNE TO(T ESS ® 3 COPMM s MTEMMK [:]4 ELECTRO14C UNE ❑ 5 AUTOMATIC RW ED 99 OTHER <br />TESTMG tOMTCRMG LEAK DETECTOR SHUTDDwN <br />V. TANK LEAK DETECTION <br />❑ i VISUAL CHECK ❑ 2 MANUAL INVENTORYRECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 GAUGING C TANK ❑ S GROUND <br />MONITORINGWATER ❑ 6 ANNUALTESTING <br />® 7 CONTINUOUS <br />INTERSTITIAL ❑ 8 SIR ❑ 9 TANK LY MANUALGING ❑ 10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHERTESTING <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />I. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YESNO <br />SUBSTANCE REMAINING GALLONS I IINERT MATERIAL ? ❑ ❑ <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY. AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />TANK OWNER'S NAME DATE ` fp <br />(PRINTED i SIGNATURE) C. Susi Jackson <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK If <br />STATE I.D.4 C❑ = I I I I I I 1 (777 <br />- <br />PERMIT NUMBER I PERMIT APPROVED BY/DATE I PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION . FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br />SHOULD BE ACCOMPANIED BY A PLOT PLAN. RLE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br />FORM 8 (6-95) FOR00348•R7 <br />