My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/29/05 09:38 FAX 925 422 2748 EPD WGNG Q004 <br /> Designated Underground Storage Tank(UST) System Operator <br /> Monthly Visual Inspection Checklist <br /> S.Jt?,o.() 99.2, Date: /j- <br /> -Facility Address: C& n2LI, t 160 <br /> -city: r-sl I Zip Code: <br /> -Desi&nated UST Operator C6nducting the Inspection: &--f- IJP,' <br /> P7 <br /> ICC Cert.#: , T71 9,a C- Exp-l)ate: I I/17 / 6 <br /> Signature: Phone: 5 qjz -,0 16 <br /> C.3 V-Yes,N=No,NA-Not A licable <br /> Item# MONITORING PANEL/ALARM HISTORY Y N NA— <br /> I Monitorin system is powered on and in proper operating mode. <br /> 2 Monitoringsystem.is not currently showing any leak alarms. <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the <br /> Designated UST Ov%erntnr. (Attach a go <br /> py ofthe alarm history reI i io <br /> _port/log o this ins pect n form <br /> 4 Each alarm for the previous month has been responded to approlnLately. <br /> 5 Sensors located in tank-to R contaimnent spam s have not ala ed in the past month. <br /> 5a List all tank-top sumps where alarms occurred in the past month; Nwxe <br /> Note,Sumps where an alarm has occurred in the past month must be Inspected unless a qualified service technician responded to,and <br /> properly addressed,the cause of the alarm.Documentation verging appropriate service should be attached to this report. <br /> Ksurfig ins ection is reguired,results should be recorded in item 6,below. <br /> i <br /> -V tIEWO-Y&N-7,77 -, - 7, <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. <br /> L Note: Visual Lns�cdon of sumps Is only re fired in sumps where an alarm has occurred in the past month which there Is no service record <br /> Y N y <br /> LumLocation: <br /> Sum Location: <br /> Sump Location: <br /> Sum D Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> I Y I N I NA I--- Y N NA <br /> Tank I -Contents: Tank 3-Contents: <br /> Tank 2-Contents: Tank 4-Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. <br /> Y N INA Y N NA <br /> D!sRenser 112 k Dispenser 7/8 <br /> Dispenser 3 4 X Dispenser 9/10 <br /> Dispenser 5 6 A Dispenser 11/12 <br /> 9 Leak detection is properly located within under-dispenser containment. <br /> Y I N NA YJ N NA <br /> Dispenser 1 2 X Dispenser 7/8 <br /> Dispenser 3 4 X Dis er A, <br /> p 9110 <br /> Dispenser 5 6 Di enser 11/12 <br /> AW,MM-773,77,77 'r, IW <br /> PAPERWORK INSPECTIONY I N INA DATE DONE <br /> 10 Monitoring system certification has been completed within past 12 months. g.6-6Gf- <br /> 11 Sec2ncontainment tests have been completed within the required timeframe. .2/. of/ <br /> 12 Spill containment structure(bucket)testing was c"m feted within the past 12 months. <br /> 13 Tank ti htness testing was co feted within required timeframe. <br /> 14 Line tightness testing was completed within requirgd timeframe. <br /> 15 Other ESqu <br /> :ired tesLin <br /> �maintcnancc was completed within required timeframe. aistlest/maintenance items below. <br /> Test/Maintenance. I I L I <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> =facility employees have received the r!�xLuired on-the-job training within the past year. <br /> All <br /> 17 All fac hired within the past 30 dM have received the required on-the-'�traininjz- J" <br /> Note: Any answer of"N" should be ex-plained in the conanent section on the following page,and will require <br /> follow-up action from the UST owner/operator. <br /> Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.