Laserfiche WebLink
09/29/05 09:39 FAX 925 422 2748 EPD WGMG 03.1005 <br /> Comments: int e <br /> Required Follow-Up Actions: <br /> ons.- <br /> Instructions: <br /> The monthly UST system inspection must be conducted by a Designated UST Operator, who possesses a <br /> current"California UST System Operator" exam issued by the International Code Council (ICC). <br /> A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator shall maintain a copy of this monthly inspection report and all attachments <br /> for the previous 12 months. The records shall be maintained on-site or,if approved by the local agency, <br /> off-site at a readily available location. <br /> Page 2 of 2 <br />