My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/29/05 09:39 FAX 925 422 2748 EPD / WGMG 0006 <br /> Designated Underground Storage Tank(UST) System Operator <br /> Monthly Visual Inspection Cheeldist <br /> Facili!y N J,,t A1,4_ S,-k ,�--n gg,2, I Date: ya 2 Z6-4 <br /> Facility Address: <br /> Cit y: c- I zip code: <br /> Designated UST Operator Conducting the Inspection: !� _ <br /> -IGC Cert.#: CC— C_ E*.Date: W 106 <br /> S' name Lf Phone: <br /> C2 Y=Yes.N m No NA-Not Ucable <br /> Item# MONITORING PANEL/ALARM HISTORY Y N NA <br /> W Ef <br /> ME, <br /> Mvt -R V-777 ;; 7727, V= Z <br /> 1 Monitoring system is powered on and in proper operating mode. <br /> 2 Monitoring gstem.is not currently showing an leak alarms. <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the <br /> Designated UST Operator. Attach a copy ofthe alarm histo g re ort/to-to this inspection <br /> 4 Each alarm for the previous month has been responded to appropriately. <br /> 5 Sensors located in tank-top containment sums have not alarmed in the past month. <br /> 5a List all tank-top sumps where alarms occurred in the past month: 4- <br /> Note:Sumps where an alarm has occurred In the past month must be inspected unless a qualified service technician responded to, rid <br /> properly addressed,the cause of the alarm.Documentation ver6ing appropriate set-vice should be attached to this report. <br /> -Ifsump inspection is re uired,results should be recorded in item 6,below. <br /> T RM-4 <br /> .A- <br /> ............. OR.- IM 7 1 <br /> n"05, 'TTRUM_071�makS. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. <br /> -*Note;Visual inspection gsum p;is Only re uired in sumps where an alarm has occurred in the po month f or which there is no servicerecord <br /> 'ff <br /> Y N <br /> Z.4 <br /> Y N <br /> 0. <br /> Sump Location: <br /> Sump Location: <br /> Sump Location: <br /> Sump Location: �+ v <br /> 7 Spill containment structures are free o£water debris,and hazardous substance. <br /> Y I N NA I ftY N NA <br /> Tank I-Contents: Tank 3-Contents: <br /> Tank 2-Contents: Tank 4-Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. <br /> N I NA Y N NA <br /> Dispenser I/2 Dispenser 718 <br /> Dispenser 3/4 Dispenser 9/10 <br /> Diseenser 5/6 DisEenser 11/12 <br /> 9 Leak detection is properly located within under-disl wuser containment. <br /> Y N NA Y N NA <br /> Dispenser I/2 Dispenser 7/8 <br /> Dispenser 3/4 Abspenser 9/10 <br /> F-Dispenser 5/6 Dispenser 11/12 <br /> ZATM R�I _FM <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 10 Monitoring system certification has been c2pMleted within past 12 months. 4 1G <br /> 11 <br /> Seco pdM containment tests have been completed within the required timeframe.I Spill containment structure{bucket testing was completedwithin the past 12 months. ,,/a <br /> - 4 <br /> 13 Tank tiWitness tfiner was rev reqLtred timeframe. Y, <br /> 1 <br /> 0 <br /> 2 <br /> 3 <br /> 14 Line tiphtness testing was completed within re timeframe. <br /> 15 Other required test maintenance was completed within required timeframe. (List testlmaintenance items below.) <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY OYEE TRAINING Y _N I NA <br /> 16 All facility eM2lo)Ms have received the re(D fired on-the-job training within the past year. <br /> 17 A11 facili Mployees hired within the East 30!Lan have received the required on-thej <br /> Note: Any answer of"N"should be explained in the comment section on the following page,and will require <br /> follow-up action from the UST owner/operator. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.