My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 12
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:43:06 PM
Creation date
6/3/2020 9:55:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 12
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 12.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/22/05 11:03 FAX 925 422 2748 EPD / WGNG 9003 <br /> SWRCB,January 2002 FINAL DRAFT Page 2 of 7 <br /> - 4. TANK ANNULAR TESTING <br /> Test Method Developed By: 0 Tank Manufacturer Industry Standard ❑Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: 0 to 30"hg Dial Gauge with I lb increments. Equipment Resolution: 2%@ Mid <br /> Tank# Tank# Tank# Tank# <br /> 882-DIU2 <br /> Is Tank Exempt From Testing?' []Yes ®No [:]Yes E]No E]Yes E]No F]Yes <br /> Tank Capacity: 1500g <br /> Tank Material: Steel/Fiberglass <br /> Tank Maritifticturer: Modem Welding <br /> Product Stored: Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time., 8:22am <br /> Initial Reading(Pq): 10.00"hg <br /> Test End Time: 9:22am <br /> Final Reading(RF): 10.00"hg <br /> Test Duration: 60 minutes <br /> Change in Reading(RF-R�: 0.00"hg <br /> Pass/Fail Threshold or Criteria: 0.00"hg <br /> 777�[ P�7 <br /> ass <br /> Was sensor removed for testing? ®Yes E]NoE]NA []YesE]NoE]NA E]Yes E]No E]NA [3Yes L7,No F]NA <br /> Was sensor properly replaced and ®yes E]No DNA [1YesE1No EINA E]Yes E]NoE]NA E]Yes ONo EINA <br /> verified functional after testing? I -- <br /> Comments—(Include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> This is an Emergency Generator Tank. <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and seta idary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.