Laserfiche WebLink
09/22/05 11:03 FAX 925 422 2748 EPD / WGNG R004 <br /> SWRCB,January 2002 FINAL DRAFT Page_-3—of 7 <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: El Piping Manufacturer Industry Standard El Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: 0 Pressure ElVacuum P Hydrostatic <br /> El Other(Specify) Equipment Resolution: <br /> Test Equipment Used: 0 to 15psi Dial Gauge with 1/2 lb increments <br /> % Mid Scale <br /> MO Piping Run# <br /> Piping Run# Piping Ron# Piping R n# <br /> 882-DIU2 FOS/FOR <br /> Piping Material: FRP <br /> Piping Manufacturer: Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method and location of <br /> pipin�isolation: Boot @ Sump. <br /> Wait time between applying <br /> pressurelvacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 8:15am <br /> Initial Reading(P-4): 5.00 psi <br /> Test End Time: 9:15am <br /> Final Reading(I;tf): 5.00 psi <br /> Test Duration: 60 minutes <br /> Change in Reading(RF-1?4): 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi <br /> Criteria: <br /> 87 <br /> Comments—(Include information on repairs made prior to testing, and recommendedfollow-y2forfailed tests.) <br /> 4"Ameron FRP piping over common Steel FOR and FOS piping. <br /> Test boot was pulled back after testing was complete. <br />