Laserfiche WebLink
SWRCB January 2002 FINAL DRAFT Page—2 of 7 <br /> — <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: 0 Tank Manufacturer industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure 0 Vacuum ❑Hydrostatic <br /> ❑Other(Speedf✓) <br /> Test Equipment Used: 0 to 30"hg Dial Gauge Equipment Resolution: 2°/a@ Mid <br /> Tank# Tank# Tank# Tank# <br /> 882-D lU2 <br /> Is T Ex From Testing?' <br /> [-]Yes �No ❑Yes [:]No ❑Yes []No [:]Yes [:]No <br /> Tank Capacity: 1500g <br /> Tank Material: Steel/Fiberglass <br /> Tank Manufacturer: Modem Welding <br /> Product Stored: Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 12:20p <br /> Initial Reading W: 10.00"hg <br /> Test End Time: 1:25p <br /> Final Reading(RF): 10.00"hg <br /> Test tion: 65 minutes <br /> Change in R): 0.00"hg <br /> Pass/Fail Threshold or Criteria: 0.00"hg <br /> Test Result Opass QFa l []Pass []Fad ❑P ❑Fail ❑Pass OFail <br /> Was sensor removed for testing? Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No ❑NA <br /> Was sensor properly replaced ®Yes❑No[]NA ❑Yes❑No❑NA ❑Yes[]No❑NA []Yes[:]No[INA <br /> verified functional after t ? <br /> Comments-(Include information on repairs made prior to testing and recommended follow-up for failed tests.) <br /> This is an Emergency Generator Tank- <br /> Secondary <br /> ankSecondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> tectinu f California mule of Resn:latinns Title 73 Section 9.637(n)(6)3 <br />