My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 13
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 4:19:45 PM
Creation date
6/3/2020 9:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 13
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 13.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 FINAL DRAFT Pae 3 of 7 <br /> Page — <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Stan ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Methal Used: ®Pressure ❑ vacuum ❑Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Test Equipinent Used: 0 to IS i Dial Gauge with V2 lb increments 2%a Mid Scale <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> 882-DIU2 FOS/FOR <br /> Piping Material: FRP <br /> PipingManufacturer: Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method and location of Boot @ Sump. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 12:05p <br /> Initial Reading(R): 5.00psi <br /> Test End Time: 1:10p <br /> Final Reading(RF): 5.00psi <br /> Test tion: 65 minutes <br /> Change in Reading(RF-Rj); 0.00psi <br /> Pass/Fail Threshold or <br /> Criteria: ®. a <br /> Test Result OPUS ❑Fail OPass ❑Fail ❑P' ❑Faii OPass ❑Fail <br /> Comments—(Include information on repairs made prior to testing, and recommen d follow-up for failed tests.) <br /> 4"Ameron FRP piping over common Steel FOR and FOS piping. <br /> Test loot was pulled back after testing was complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.