Laserfiche WebLink
SWRCB,January 2002 FINAL DRAFT Pae 3 of 7 <br /> Page — <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Stan ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Methal Used: ®Pressure ❑ vacuum ❑Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Test Equipinent Used: 0 to IS i Dial Gauge with V2 lb increments 2%a Mid Scale <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> 882-DIU2 FOS/FOR <br /> Piping Material: FRP <br /> PipingManufacturer: Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method and location of Boot @ Sump. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 12:05p <br /> Initial Reading(R): 5.00psi <br /> Test End Time: 1:10p <br /> Final Reading(RF): 5.00psi <br /> Test tion: 65 minutes <br /> Change in Reading(RF-Rj); 0.00psi <br /> Pass/Fail Threshold or <br /> Criteria: ®. a <br /> Test Result OPUS ❑Fail OPass ❑Fail ❑P' ❑Faii OPass ❑Fail <br /> Comments—(Include information on repairs made prior to testing, and recommen d follow-up for failed tests.) <br /> 4"Ameron FRP piping over common Steel FOR and FOS piping. <br /> Test loot was pulled back after testing was complete. <br />