Laserfiche WebLink
SWRCB.January 2002 DRAFT Page 3 of 7 <br /> _ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: N Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Test Equipment U : 0 to 15 Dial Gaua with 2 Ib increments 2% d Mid Scale <br /> Piping Ran# Piping Run# Piping Run# Piping Run# <br /> 882-D1U2 FOS/FOR <br /> Piping Material: FRP <br /> Piping Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method and location of Boot @ Sump. <br /> pipm -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 12:05p <br /> Initial Reading(RI): 5.00psi <br /> Test End Time: 1:lop <br /> Final Reading(RF): 5.00psi <br /> Test tion: 65 minutes <br /> Change in Reading(RF-R;): 0.00psi <br /> Pass/Fad Threshold or 0 00psi <br /> Crit <br /> Test'ResuIt SPass ❑Fail []Pass ❑Fail OPass ❑Fail []Fail <br /> Comments—(Include information on repairs made prior to testing, and recommended follow-up f©r failed tests) <br /> 4"Ameron FRP piping over common Steel FOR and FOS piping. <br /> Test boot was pulled back after testing was complete. <br />