Laserfiche WebLink
SWRCB,January 2002 FINAL DRAFT Page 4 of 7 <br /> 6. PIPING SUMEP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑other(specify) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br /> Sump# Sump# Sump# Sump# <br /> 879-G3U1 879D1U1 <br /> Sump Diameter: 42" 19" <br /> Sump Depth from Top of T 27.25" 27.00" <br /> Sump Material: FRP Coated Steel <br /> Height from Tank Top to Top of 12.25" 13.50" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Top of 15.25" 2200" <br /> Lowest Electrical Penetration: <br /> Condition of sump prior to testing: Clean/Dry Cl <br /> Depth of Sump Tested' 14.50" 18.75" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Oyes❑No❑NA ❑Yes❑No UNA ❑Yes[]No❑NA ❑Yes❑No❑NA <br /> induct and water)?' <br /> Turbine shutdown response time: 10 seconds Safe Suction <br /> Is system programmed for fail-safe Yes[]No[]NA ❑Yes❑No NA ❑Yes❑No❑NA ❑Yes —]No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be <br /> o rational?" es❑No❑NA []Yes❑No SNA ❑Yes[]No❑NA []Yes❑No❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 minutes 10 minutes <br /> test: <br /> Test Start Time: 8:45am 10:05arn <br /> Initial Reading(Rz): 14.50" 18.75" <br /> Test End Time: 9:35am 10:45am <br /> Final Reading(RF): 14.50" 18.75" <br /> Test tion: 50 minutes 40 minutes <br /> Change in Reading(RF-Ry): 0.00" 0.00" <br /> Pass/Fail Threshold or Criteria: 0.005" 0.005" <br /> Test Result ZPass, ❑Fail OPass ❑Fail ass ❑Fail ❑P ❑Fail <br /> Was sensor removed for testing? Oyes❑No❑NA Myes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and es❑No❑NA EYes❑No❑NA ❑Yes❑NoNA <br /> verified functional after testin ? ❑ ®Yes❑No❑NA <br /> Comments—(Include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO",then the entire sump should be tested. (See SVVRCB LG-160) <br />