Laserfiche WebLink
SWRCB_January 2002 FINAL DRAFT Page 5 of 7 <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Does Facility have UDC(s)? ®Yes[]No <br /> Test Method Developed By: ❑UDC Manufacturer Industry Standard Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spe(.*) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator Equi ent Resolution: 0.0025" <br /> UDC# UDC# UDC# UDC# <br /> 879-G3U1 #1-2 879-G3U1 #34 879-DIUI #5 <br /> UDC Manufacturer: Bravo Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel Coated Steel <br /> UDC D th. 8.00" 7.50" 8.50" <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: 0.00" 0.00" 0.00" <br /> Height from UDC Bottom to <br /> T.n-est Electrical Penetration. 0.00" 0.00" ®. >' <br /> Condition of UDC prior to <br /> testin : Clea Clea Clead/Dry <br /> Depth of UDC Tested: 4.75" 5.50" 8 0099 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ONA ❑Yes❑No ONA ❑Yes❑No NNA ❑Yes[-]No[-INA <br /> product and water)?* <br /> Turbine shutdown response time: Float with Chain Float with Chain Float with Chain <br /> Is system programmed for fail- ❑yes❑No ONA ❑Yes❑No ZNA ❑Yes❑No NNA ❑Yes❑No ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes❑No ONA ❑Yes❑No ONA ❑Yes❑No ZNA ❑Yes❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5 minutes 5 minutes 5 minutes <br /> starting test: <br /> Test Start Time: 1:50pm Llopm L lopm <br /> Initial Reading(Rj): 4.75" 5.50" 8.00" <br /> Test End Time: 2:15pm 1:35pm 1:35pm <br /> Final Reading(RF): 4.75" 5.50" 8.00" <br /> Test tion: 25 minutes 25 minutes 25 minutes <br /> Chan a in Reading(RF-Rj): 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or Criteria: 0.00'9 0.00" WWI <br /> Test Result Pass Fail ail SPass, ail OPass, OFail <br /> Was sensor removed or disabled ❑yes❑No ONA ❑Yes❑No ZNA ❑Yes❑No ENA ❑Yes❑No❑NA <br /> for testing? <br /> Was sensor properly replaced and ❑yes❑No SNA ❑Yes❑No NA ❑Yes❑NoNA ❑Yes❑No❑NA <br /> verified functional after testing? <br /> Comments-(Include information on a prior to testing,and recommended follow-up for failed tests.) <br /> UDC's were tested on 8-02-2011 after monitor certification was complete. <br /> ' If the entire depth of the UDC is not tested, how much was tested.. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO",then the entire UDC should be tested. (See SWRCB LG-160) <br />